TMD Homes Inc. Logo
Resources

How Much Does Framing Cost in New Brunswick?

2026 Pricing Guide — TMD Homes Inc.

If you're planning a townhouse, apartment building, or home build in New Brunswick, framing is one of the largest labour line items in your budget. Here's what you need to know about framing costs, how they're calculated, and what to expect when you request a quote.

Framing Prices in New Brunswick (2026)

Framing costs vary depending on project complexity, design, number of stories, and site conditions. The figures below reflect typical starting ranges — your actual quote will be based on your specific plans and requirements.

Stick Framing
Varies by project
Priced per square foot based on scope

Traditional on-site framing where every piece of lumber is cut and assembled at the job site. Ideal for complex layouts, custom designs, and projects requiring high adaptability. Price depends on floor plan complexity, number of stories, and site conditions.

  • Maximum design flexibility
  • Ideal for complex floor plans
  • Suitable for all project types
  • Labour only — materials billed separately
Panel Framing
Varies by project
Priced per square foot based on scope

Pre-built wall panels manufactured to your specs and assembled on-site. Faster installation and highly consistent quality — the preferred method for townhouse rows and multi-unit apartment buildings. Generally more cost-effective than stick framing for straightforward layouts.

  • Faster installation timeline
  • Excellent for townhouses & apartments
  • Consistent, factory-quality results
  • Labour only — materials billed separately

Why Does Framing Cost Vary?

No two projects are priced the same. Here are the main factors that affect your per-square-foot rate:

Floor plan complexity: Custom angles, cathedral ceilings, and irregular layouts require more cuts and time.
Number of stories: Multi-storey builds involve scaffolding, more structural connections, and longer timelines.
Project size: Larger projects with repetitive layouts can often be priced more efficiently.
Site conditions: Access, terrain, and weather during build can affect labour time.
Roof design: Complex roof lines (hips, valleys, dormers) add significant framing labour.
Schedule and timeline: Accelerated schedules or phased delivery may affect overall pricing.

All pricing is for framing labour only unless otherwise stated in writing. Lumber, hardware, and materials are billed separately. Contact us with your plans for an accurate quote.

What Affects Your Framing Cost in New Brunswick?

Project Complexity

A straightforward rectangular floor plan costs less to frame than a design with multiple roof pitches, cantilevered sections, or irregular angles. The more cuts and custom fits required, the more labour time per square foot.

Number of Stories

Multi-story buildings require scaffolding, more complex structural connections, and longer installation cycles. A 2-storey townhouse will have a higher per-square-foot cost than a single-storey building of the same footprint.

Framing Method

As shown above, panel framing ($6.50/sq ft) is less expensive to install than stick framing ($10/sq ft) for standard layouts. The right method depends on your design. We'll recommend the best approach for your project when we review your plans.

Project Size and Repetition

Larger projects with repetitive floor plans — such as a 24-unit apartment building where every floor is nearly identical — allow for efficient crew deployment. This efficiency benefits the client through a predictable timeline and consistent quality.

Lumber Market Conditions

Lumber prices in Canada fluctuate with market conditions. Our per-square-foot rates are for labour only — materials are priced separately at market rates at the time of ordering. We'll provide a full materials estimate as part of your quote.

Framing FAQ — New Brunswick

What is the difference between stick framing and panel framing?

Stick framing is the traditional method where lumber is cut and assembled on-site, piece by piece. Panel framing uses pre-built wall panels manufactured off-site and assembled on location. Stick framing offers more flexibility for complex designs; panel framing is faster to install and more consistent in quality.

Why is panel framing less expensive per square foot?

Panel framing costs less to install because the panels are pre-built to exact specifications, reducing on-site labour time. The consistency also means fewer adjustments and corrections during installation. For straightforward layouts like townhouses and apartment buildings, panel framing delivers excellent results at a lower cost.

Does the framing quote include materials?

TMD Homes Inc. quotes are for labour only unless otherwise stated in writing. Lumber and hardware costs are separate and fluctuate with market pricing. We can provide a full material and labour estimate for your project.

How long does framing take?

Timeline depends on project size and type. A 4-unit townhouse typically takes 2–6 weeks depending on the number of stories. A 24-unit apartment building runs approximately 1 week per floor, totalling around 2 months for the framing phase.

Do you offer a warranty on framing work?

Yes. TMD Homes Inc. provides a 2-year labour warranty on all framing work. If an issue arises from our workmanship, we assess and address it promptly at no charge.

Have you ever failed a framing inspection?

No. In our entire history, TMD Homes Inc. has never failed a building inspection. This is a direct result of our methodical, code-first approach to every project — we do not rush inspectable work.

Get a Framing Quote for Your Project

Send us your plans and we'll provide a detailed labour quote. No obligation.

Request a Quote